Friday, 22 September 2017

AVRMC open day and double success.

On the 27th of August, the Sunday of the bank holiday weekend. AVRMC held an open day for the public to see what we do.
The day generally went very well with only complementary comments received and a few interested people.

In the months and weeks leading up to the open day we had been concentrating on getting all the track on Lightcliffe operational and reliable. This had been achieved but only with one controller for all tracks. During the morning, after settling in, track cleaning etc, I investigated getting both controllers available so we could run two trains at once. This seemed to just need some wires connecting with a choc-block. This was done in stages, to check at each point, that I hadn’t stopped the other controller from working or created a short. Once the second controller was connected to the track it was tried, but.. nothing! A look underneath the control panel showed that the controller didn’t have a supply to it so a link was added from the supply for the first controller, then… it worked!


Sadly I can only upload this one video due to size limits on Blogger. I have two other, better, ones. Anyone know an easy way to reduce video file sizes?

Edit to add that the videos should be viewable on these links: https://youtu.be/iJKM9VmxVp0 https://youtu.be/yKvN8xrDhQE

No comments:

Post a Comment